This building was designed according to the latest technology and housing standards, having particular attention to the quality of materials and energy consumption. The equipment and finishings include:
- Facades insulated with ETICS (External Thermal Insulation Composite System) and coloured plastering
- Double glazed windows with thermal insulation and electrically controlled blinds in lacquered aluminium
- Two lifts supplied by Schindler, with 8 and 5 person capacity
- Solar thermal panels for water heating, complemented by dedicated boiler in the apartments
- Air conditioning system supplied by Daikin
- Smoke detection system in the garage
- Intercom with image and sound
- Data network within each unit as per latest data requirements
- Unit doors with high security standard
- Lacquered interior doors and wardrobes
- Laminate flooring
- Skirting board in lacquered MDF (medium-density fibreboard)
- Plaster coated and painted walls
- Kitchen countertop in light silestone, stainless steel sink and Grohe water tap
- Kitchen furniture lacquered in white and grey
- Kitchen equipped with fitted appliances supplied by Bosch, including cooking exhaust, induction hob, oven, fridge, freezer, dishwasher and clothes washer
- Humidity resistant plasterboard ceilings in the bathrooms with low consumption track lighting
- Bathrooms equipped with shower or bathtub, suspended china, washbasin with Grohe faucet and lacquered cabinet